Expansion Gap For Siding

Choose the right nails.
Expansion gap for siding. Vertical trim gap caulking. Vinyl siding must be nailed so expansion and contraction are not restricted. Allow a 1 4 in. Use a keyhole or reciprocating saw with a fine tooth blade to remove enough material from one of the pieces of lap siding.
Do not nail through overlaps. Remove any sawdust dirt or debris from the gap to prep it for finishing. For siding up to 6 inches wide use one nail one inch up from the lap. Leave a 1 8 gap between the siding and the trim or other materials to allow for structural movement.
Gap for expansion wherever siding butts accessories. Allow for expansion and contraction. If the panels are 20 feet 6 1 meters or longer refer to the manufacturer s instructions for how to increase the gap. Do not caulk between siding and any built in receiving channels located at or around windows.
Face nail with two nails per piece for 8 inches patterns and wider keeping nails 2 1 2 to 3 inches apart to allow for dimensional movement without splitting. Create a proper 3 16 space at minimum between the two pieces of siding. When installing in freezing weather below 40. As a result the expansion gap between the top of the tongue and bottom of the groove can range from o to 1 8.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried. An improper expansion gap may have similar consequences to the results shown above especially if the milling process is irregular. Allowance should be made for expansion and contraction by leaving a 1 4 6 4mm gap between the siding and all corner posts and channels.