Flashing Where Siding Meets Stone
Then flash again on top of the stone out to about 1 2 inch beyond the siding.
Flashing where siding meets stone. Stucco cladding install self adhesive flashing behind the weep screed a perforated metal strip at the base of the exterior walls at the height above grade specified by the local building code. Install the kickout flashing. Install a flashing across most of the top of the stone and up at least three inches behind the siding. Wall or siding connection to foundation top porch floors slabs.
Install the water resistant barrier to overlap the top edge of the weep screed. This aritcle describes the cause repair and prevention of leaks rot damage at a wood framed wall that was not properly flashed and sealed at the wall bottom. Run the l shaped flashing up under the bottom row of siding so that it tucks under the final bottom row and on top of the wall and on top of the last row of bricks before you cap it with the cap. The solution to rotting sidewalls is a small piece of bent metal called a kickout flashing at roofing suppliers which simply directs all that water away from the wall.
Building wall or siding flashing details at horizontal surfaces. Install the lathe and stucco to the first bend in the weep screed.