Flashing A Metal Roof Valley

Then install a non corrosive metal valley flashing of 24 minimum width lap successive sheets of metal flashing a minimum of 12 inches and seal laps.
Flashing a metal roof valley. Fold the top of the flashing over the ridge. Slip a piece of sheet metal flashing under the top layer of shingles to protect the bottom layer in the valley while you cut the shingles with a hook blade. Use 1 inch galvanized roofing nails. Apply an approximately 3 inch.
Lay the flashing down in the roof valley and start at the lower end of the roof. Metal roof flashing installation. Cut the bottom edge and fold it down over the drip edge. Step 9 cut corners and apply cement dub cut the top layer shingles see step 4 in open metal valley above.
Protect the eave from ice dams and sideways rain step one in steep slope roofing is the edge flashing. Now nail this first flashing at both its far ends. Step 6 install the flashing. Make metal roof valley clips cleats get some of the flashing material that matches your valley flashing in metal and thickness cut some strips the dimensions are not critical maybe 3 4 to 1 1 2 wide x roughly 5 6 long bend one end of each strip over roughly 3 4 to 1 but do not hammer it.
Two ways to flash roof edges. Make sure to cover the gap at the bottom of the raised ridge. A quick step by step guide on how to flash a metal roof. For example in metal roofing systems valleys are commonly fabricated with hems but can also be fabricated without them in which case they could still be used for metal roofing or any other type of roofing.
Valley flashings are custom fabricated to any measurements and angles and usually measure 10 in length but can also be bent in 12 lengths. Remember to caulk the underside of the flashing with a sealant. Install an underlayment centered in the roof valley. Details concrete masonry roofing wrb flashing.
Recommended procedures of basic valley flashing installation. Make sure that the end of the flashing panel is perfectly in line with the edge of the roof. Install valley battens on both ends of the roof valley then attach first flashing 3 4 inches over the roof flange and another 3 4 inches over the fascia if any is present. Attach the flashing panel in place at the bottom.