Fire Wall To Roof Detail

C roof ceilings45 51 steel framed including steel bar joist framing steel c joist framing steel truss and steel roof deck.
Fire wall to roof detail. Wood framed including dimensional lumber engineered joist and truss. The testing demonstrated that the fire will not travel to the wall s unexposed side via the vapor barrier. This concern should now be alleviated. The project has m and s2 occupancies with some of the s2 separated with a 2hr fire barrier wall.
Construction is type v b so there is no general requirement to rate the roof deck assembly. The roof insulation is continuously draped over the top of the wall. 6 1 typical party wall and roof applications roof details compliant battens and sarking over party wall sarking not shown for clarity compliant fire rated separating wall brick wall shown bradford fireseal party wall sealer compressed between roof tiles and top of party wall truss rafter line roof tiles figure 6 1 2. Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
D horizontal membrane 52 shaft wall used in a horizontal plane. Openings are permitted in fire walls and are discussed in detail in the code corner no. Floor and roof connections to each fire wall are the same as for conventional concrete masonry construction. The code is 2009 ibc.
Fire walls building separation openings are protected and limited continuous from foundation to through roof and exterior wall to through exterior wall structural stability fire barrier shafts occupancy separation openings are protected and limited continuous from floor through concealed space at each level fire partition. Corridors openings are protected may terminate at a fire rated floor ceiling roof assembly. It utilizes two independent concrete masonry walls side by side each meeting the required fire resistance rating. 34 openings part 1 joints within fire walls and between fire walls and other fire resistive construction such as floor or floor ceiling assemblies and roof or roof ceiling assemblies must be protected for a time period that is not less than the.
I was wondering what you might think about the required detail for a head of wall joint at a fire barrier wall in the following case. The detail drawings are grouped by details and can be downloaded below in dwg or pdf format. Where the room side fire resistance rated membrane of the corridor is carried through to the underside of the floor or roof sheathing deck or slab of a fire resistance rated floor or roof above the ceiling of the corridor shall be permitted to be protected by the use of ceiling materials as required for a 1 hour fire resistance rated floor or roof system. Some building officials had required this vapor barrier to be cut and re attached to each side of the wall.
The exception is where the roof is of reinforced concrete construction and has a fire resistance of at least one hour for a two hour firewall or two hours for a four hour firewall.